A two day floor demo in Lakeland MN. The entrance, hallway, and closets all needed the flooring removed as well as casing. Site protection was needed all along the living room and hallways.
After the floor was removed, and cuts were made to preserve the tile leading to the bathroom, the site was cleaned, and ready for the next sub.